Gardening tool
Calculate how much compost you need to prepare new beds or top-dress existing ones.
The calculator multiplies the area by the compost layer depth for your job:
Volume (m³) = area (m²) x layer depth (mm) ÷ 1,000
For new beds it uses a 50 mm layer dug into the topsoil. For established beds it uses a 25 mm top-dressing. You can also enter your own depth.
Preparing a new 10 m² bed with a 50 mm layer needs 0.5 m³ of compost. That is 500 litres, or 13 bags of 40 litres (12.5 rounded up).
Every figure below can be changed in the calculator or is shown in your result.
| Figure | Value used | Why |
|---|---|---|
| New beds | 50 mm, dug into the top 15 to 30 cm | University extension guidance suggests about 50 to 75 mm for new beds. |
| Top-dressing | 25 mm a year | Common guidance for established beds. |
| Bag sizes | 30, 40 or 50 litres | Check the label. Sizes vary. |
Not included: Delivery, digging labour, fertiliser and soil testing.
For a new bed, a 50 mm layer needs 50 litres per square metre. Top-dressing at 25 mm needs 25 litres per square metre.
Yes. Very heavy compost use can make soil too rich in some nutrients. Follow the recommended depths and mix it into the soil.
Spring and autumn are good times, before planting and while plants are actively growing.
Keep planning